Международные клиенты:

 

BOSCH Rexroth supplier No. 97083138, BOSCH material group code No. R7513

Confidentiality Agreement with MAN Diesel & Turbo of German

FranceSNF Sas Order No.: 036554-2/T00EBO (twin-screw pump unit)

Iranseven-diamonds steel mill complex company

Iran KHAVAR ENGINEERING COMPANY

Turkey Petroland company (HWG208, HWG185, total 6 bare shaft, 2013);

Iraq Oilserv company (HMG151-40, total 2 pump unit, 2013)

Registered supplier for VOITH of Geкmaтy, Danieli of Italy, Atlas Copco of Sweden

Indonesia Steamfast (HWG140, total 2 bare-shaft with SS316L, 2013)

IndiaMETALIKS 180 Steel Tube Project

 

 Основные клиенты в металлургии:

 

Baosteel No. 5 Cold-rolling (2007)

Wuhan Iron and Steel No. 3 Cold-rolling Project (2008)

Shougang Jingtang United Iron and Steel Co., Ltd.

  2250mm Hot-rolling (2008)

  1580mm Hot-rolling (2009)

  2230mm, 1700mm, 1550mm Cold-rolling (2009)

ChongqingSteel Environmental Relocation Project

 4100mm Wide and Thick Plate (2009)

 1780mm Hot-rolling (2009)

 2700mm Medium Plate (2011)

Panzhihua Iron and Steel Xichang  2050mm Hot-rolling (2010)

 

Основные клиенты в области энергетики:

 

Zhejiang Huaneng Yuhuan Power Plant    4*1000MW Power Unit (2006)

Zhejiang Guohua Ninghai Power Plant Power Unit (2008)

Wujiang River Goupitan Hydroelectric Power Station   5*600MW Power Unit (2009)

Yunnan Jin'an Qiao Hydropower Station     4*600MW Power Unit (2011)

Qin Shan Nuclear Power Station    Phase Ⅱ Extension Project (2009)

Yangjiang Nuclear Power Station Project    2*1000MW Power Unit (2011)

 

Основные клиенты в нефтехимической промышленности:

 

Sinopec Shanghai Petrochemical Co., Ltd.

 Sulfur-contained Crude Oil Processing Reconstruction Project (2002)

 

Sinopec Shanghai Petrochemical Co., Ltd.

 Asphaltum Pump Reconstruction Project (2003)

Sinopec Xi'an Petrochemical Co., Ltd.

 Crude Oil Tank Farm Reconstruction Project (2002)

 

Zhenhai Refining & Chemical Company (2003)

SPS Modified Asphalt Equipment Expansion and Reconstruction Project

 

Accessorial Project of Sinopec Jinling Petrochemical Co., Ltd.

Processing High-sulfur Crude Oil Overall Reconstruction Project (2004)

 

Sinopec Guangzhou Petrochemical Co., Ltd.

 Storage and Transportation Tank Farm Expansion Project (2005)

 

Zhonghai Asphaltum (Yingkou) Co.,Ltd.

500 Thousand Ton Heavy-traffic Paving Asphalt Project (2009)

 

Sinopec Maoming Petrochemical Co., Ltd.

500 Thousand Ton Asphalt Reconstruction Project (2011)

 

 

Основные клиенты в строительной индустрии:

 

Guangzhou Nanbo Glass Co., Ltd.      550 t/d float plate glass production line (2006)

Xinyi Glass Engineering (Dongguan) Co., Ltd.  500 t/d, 300 t/d float plate glass production line (2007)

 

Jiangmen Farun Glass Co., Ltd.     600t/d float plate glass production line (2008)

Changshu Yaopi Glass Co., Ltd.     250d/t ultra clear rolled glass production line (2009)

Wansheng Branch of Fuyao Glass Industry Group Co. 600t/d float plate glass production line (2010)

TG Xianyang Glass Co., Ltd.         1200t/d float plate glass production line (2011)